Commercial chain link perimeter fence at a Kentucky industrial facility — S&S Fencing

    Markets We Serve

    Data Center Perimeter Fencing & Crash-Rated Gates

    Layered perimeter fencing, anti-climb mesh and vehicle barrier scopes for data center construction in Kentucky, Southern Indiana and along the I-65 corridor.

    • Operating since 2015
    • Family-owned & woman-owned
    • BBB A+ Accredited
    • Blue Book ProView Verified

    General liability and Workers’ Compensation carried — COIs on request. See full prequalification and contractor credentials.

    Threat model and the three perimeter layers

    A data center perimeter is built in three layers: a site boundary that establishes standoff and delays approach, a yard line that protects generators and mechanical equipment, and interior caging or partitioning inside the building envelope.

    Each layer answers a different threat. Treating them as one continuous fence line is the most common cause of a rejected perimeter submittal.

    • Layer 1 — site boundary. Deters and delays pedestrian intrusion, defines standoff distance, and carries camera and lighting infrastructure. Climb resistance and clean camera sightlines matter more than mass here.
    • Layer 2 — yard and generator line. Protects fuel storage, generators, switchgear and chillers. Usually the line where copper theft actually happens.
    • Layer 3 — interior cage. Separates colocation tenants and restricted rooms inside the shell.
    • Vehicle threat. Addressed at the openings — see the crash-rated barrier section below — not by upgrading the whole fence line.

    Systems by zone

    358 anti-climb welded mesh in a 3 inch by 0.5 inch aperture at 8 gauge is the standard data center boundary fabric, with ornamental aluminum at public frontage and galvanized chain link at generator and mechanical yards.

    ZoneSystemSpecification driver
    Site boundary358 anti-climb welded mesh, 3" x 0.5" aperture, 8 gaugeNo hand or toe hold, resists cut-and-peel, minimal visual obstruction for cameras
    Public / street frontageCommercial ornamental aluminumZoning and design-review expectations at the street face
    Camera and detection linesWelded wire with rigid frameworkRigidity so vibration and fence-mounted detection behave predictably
    Generator, fuel and mechanical yardsGalvanized commercial chain link, framed and toppings as specifiedCost-effective enclosure with clear service access
    Construction phaseTemporary construction fencingSite control before the permanent line goes in

    Heights are typically 8 ft plus topping where specified. Posts are driven where soil allows for a straighter, longer-lasting line; rock and structural fill conditions get set posts. More on base scope at our industrial fencing page.

    Crash-rated vehicle barriers: ASTM F2656

    Vehicle barriers are rated to ASTM F2656, which pairs a test vehicle and impact speed designation — M30, M40 or M50 — with a penetration rating of P1, P2, P3 or P4 describing how far the vehicle bed traveled past the barrier.

    The M50 designation is the 15,000 lb medium-duty truck at 50 mph benchmark. Older K-ratings from the retired Department of State standard still appear in specifications, so the equivalence matters when reading an existing spec section:

    ASTM F2656 ratingTest vehicle / speedApproximate legacy K-rating
    M50 / P115,000 lb truck at 50 mph, minimal penetration≈ K12 / L3
    M40 / P215,000 lb truck at 40 mph≈ K8
    M30 / P315,000 lb truck at 30 mph≈ K4

    Crash-rated barriers, bollards and gates are certified as tested assemblies including their foundations, so the foundation detail cannot be value-engineered without voiding the rating. We install to the manufacturer’s certified detail and coordinate the foundation with the concrete and civil scopes. The rated product line for your project is confirmed against the specification before bid.

    Gates, operators and access control

    Data center vehicle gates are high-cycle assemblies that must comply with UL 325 for gate operators and ASTM F2200 for gate construction, including entrapment protection and safe clearances.

    • High-cycle cantilever slide gates at main and service entries, sized for continuous delivery and staff traffic rather than occasional use.
    • UL 325 compliance: operator class matched to the application, with primary and secondary entrapment protection means installed and tested.
    • ASTM F2200 compliance: gate construction, clearances, no exposed pinch points, and no protrusions on the leading edge.
    • Credential readers and detection: card, mobile or LPR readers, loops or radar, plus free-exit and anti-tailgate arrangements as the security design requires.
    • Emergency-responder access: keyed override, knox-type box or manual release per the local fire district’s requirement.
    • Trade coordination: we set gate, post and conduit stub locations, then coordinate final power and low-voltage terminations with the electrical and security subcontractors. Full gate scope at commercial gates and operators.

    Large automated openings are work we already do. At Four Roses Distillery in Cox's Creek, Kentucky, S&S Fencing installed a 35 ft commercial chain link cantilever entrance gate and a 28 ft custom fabricated metal cantilever security gate, both running on LiftMaster operators — see the Four Roses case study for the full scope.

    Compliance context — the owner's obligations our scope supports

    Physical perimeter controls are how a data center owner demonstrates the physical-security portion of frameworks such as NIST SP 800-53, SOC 2 and ISO/IEC 27001, along with ADA and IBC requirements at gates and pedestrian routes.

    Those obligations sit with the owner or operator being audited. S&S Fencing does not hold or certify against those frameworks; we install the perimeter, gate and barrier scope that the owner’s security design relies on, and we document what was installed so it can be evidenced in an audit.

    • NIST SP 800-53 physical access families: supported by controlled openings, credentialed gates and defined boundary layers.
    • SOC 2 and ISO/IEC 27001: auditors ask what the boundary is and how access is controlled at it — a documented gate schedule and fabric specification answers that.
    • ADA: pedestrian gates, hardware height and operating force, and accessible route continuity through the perimeter.
    • IBC: egress through perimeter openings and required clear widths.
    • Project-specific scope: the framework and audit scope the perimeter is being evidenced against is confirmed with the owner at bid, so the submittal package matches what the auditor will ask for.

    General contractor coordination on a live site

    Fence and gate work on a data center runs under the general contractor's site rules: badging, escorted access, background screening where the owner requires it, and phasing around energization.

    • Access: we work to your badging and escort procedure and submit crew rosters in advance.
    • Screening: owner-required screening is completed through the owner’s process, whatever that process requires for our crews on your site.
    • Live-site rules: no work over energized equipment, coordinated lifts, and strict housekeeping around generator and switchgear yards.
    • Phasing around energization: yard fencing frequently has to close after equipment sets, so the sequence is agreed against your CPM schedule instead of assumed.
    • Utilities: locates before every drive or auger line, with private locates where the site has unmapped duct banks.
    • Prequalification: insurance, safety program, COI turnaround and references are on our contractor credentials page.

    Credentials and proof for prequalification

    S&S Fencing & Property Maintenance LLC has operated since 2015 as a family-owned and woman-owned Kentucky contractor, is BBB A+ accredited and Blue Book ProView Verified, carries general liability and Workers' Compensation, and provides COIs on request.

    • Certificates of insurance naming the requesting party as additional insured, W-9, safety program documentation and project references are provided during prequalification — see the contractor credentials page.
    • Prequalification questionnaires and portal invitations are completed on request.
    • Related industrial work along the corridor: I-65 corridor industrial fencing, plus photo documentation in the projects gallery.

    How We Work

    Our Process

    1. Step 1

      Spec and drawing review

      We read the fence and barrier spec sections, flag rating conflicts and foundation issues, and confirm what the security design assumes.

    2. Step 2

      Submittals and coordination

      Material data, galvanizing class, gate and operator cut sheets, certified barrier details, and conduit stub coordination with the electrical scope.

    3. Step 3

      Phased installation

      Locates, driven or set posts by soil condition, temp fence where the permanent line is deferred, sequenced against your CPM schedule.

    4. Step 4

      Testing and closeout

      UL 325 entrapment protection tested and documented, gate schedule and operator manuals turned over, 1-year workmanship warranty.

    Frequently Asked Questions

    The standard data center boundary fabric is 358 anti-climb welded mesh — a 3 inch by 0.5 inch aperture in 8 gauge wire — because it offers no hand or toe hold, resists cut-and-peel attacks and barely obstructs camera sightlines. Ornamental aluminum is typically used at public street frontage and galvanized chain link at generator and mechanical yards.
    Under ASTM F2656, an M50 rating means the barrier was tested against a 15,000 lb medium-duty truck impacting at 50 mph, and the paired P rating states how far the vehicle bed penetrated past the barrier — P1 being minimal penetration. M50/P1 corresponds approximately to the legacy K12/L3 designation from the retired Department of State standard.
    No. Crash-rated barriers, bollards and gates are certified as complete tested assemblies that include their foundations, so changing the foundation detail voids the rating. Installation must follow the manufacturer's certified detail, which means the foundation has to be coordinated with the concrete and civil scopes rather than substituted later.
    Gate operators are governed by UL 325, which requires the operator class to match the application and requires primary and secondary entrapment protection to be installed and tested. Gate construction itself is governed by ASTM F2200, which covers clearances, pinch points and leading-edge protrusions.
    No. SOC 2, ISO/IEC 27001 and NIST SP 800-53 are obligations of the data center owner or operator being audited. S&S Fencing installs and documents the perimeter, gate and vehicle barrier scope that the owner's physical-security controls depend on so that installation can be evidenced during an audit.
    Yes. S&S Fencing works to the general contractor's site access procedure, submits crew rosters in advance for badging, accepts escorted access requirements, and phases work around equipment energization on the project's CPM schedule. Owner-required background screening is completed through the owner's process.

    Send us the drawings and the spec section

    We bid from plans, walk the site, and return a line-item scope. Ask Shawn or Shelby Fick directly at 502-468-1209.

    Also See

    Related Scopes & Documentation

    Family-Owned · Woman-OwnedFully Insured · COIs on Request1-Year Workmanship WarrantyNew Installs & Full ReplacementsFree On-Site Estimates
    BBB Accredited BusinessBlue Book ProView Verified

    Ready for your free fence estimate? Call Shawn & Shelby anytime.