Chain link enclosure around a commercial solar array — Kentucky, S&S Fencing

    Markets We Serve

    Utility-Scale Solar & BESS Perimeter Fencing

    Perimeter fencing built by the mile for utility-scale solar arrays and battery energy storage sites across Kentucky, Southern Indiana and the I-65 corridor.

    • Operating since 2015
    • Family-owned & woman-owned
    • BBB A+ Accredited
    • Blue Book ProView Verified

    General liability and Workers’ Compensation carried — COIs on request. See full prequalification and contractor credentials.

    Scope and scale on a utility-scale site

    Utility-scale solar perimeters are measured in miles, not linear feet, so the number an EPC schedules against is production rate per crew per day — and that rate, not unit price alone, determines whether the fence scope holds the schedule.

    • Perimeter length: a site of a few hundred acres commonly runs several miles of boundary fence, plus interior fencing at substation and BESS blocks.
    • Mobilization: equipment, material laydown and access-road condition drive the first week more than crew size does.
    • Production rate: committed in writing from your drawings and a site walk, because terrain, rock and access road condition move the rate more than anything else on the plan set.

    Posts are driven rather than hand-set on production runs, which is faster and produces a tighter line that stays plumb over a 30-year asset life. See post augering and driven-post installation.

    Specifications: fixed-knot high-tensile vs chain link

    Utility-scale solar perimeters are usually built from either fixed-knot high-tensile wire or galvanized chain link, and the choice is a trade between installed cost per mile, service life in the site's environment, and what the owner's security requirement demands.

    AttributeFixed-knot high-tensileGalvanized chain link
    Installed cost per mileLowerHigher
    Wire12.5 gauge at 179,000–200,000 psi tensile, roughly 1,380–1,535 lb breaking strength9 or 11 gauge fabric, framed
    Terrain followingExcellent — conforms to grade change without panel breaksRequires stepping and more posts on grade
    Security postureDeterrent; harder to top and stretch than field fenceHigher — accepts barbed or razor topping and rigid framework
    Typical useLong array boundary runsSubstation, inverter pads, BESS enclosures

    Galvanizing class and service life

    Coating class is the specification line that decides whether a fence survives the asset’s life. Class 1 galvanized carries substantially less zinc than Class 3 and corrodes years earlier in the same environment; Class 3 is the default on a 25 to 35 year solar asset. In aggressive environments — high humidity, agricultural runoff, coastal or industrial exposure — a Bezinal-type zinc-aluminum coating extends service life well past Class 3 galvanizing and is worth specifying up front rather than replacing fence later.

    Heights, spacing and site conditions

    • Heights: 6 ft to 8 ft, with the height often set by the utility interconnect agreement or NESC-driven substation requirement rather than by preference.
    • Post spacing: line-post spacing tightens on curves, grade breaks and long straight tension runs; braced corner and end assemblies are sized to the wire tension, not copied from residential detail.
    • Terrain following: fixed-knot wire is stretched to follow grade so there is no gap under the bottom wire.
    • Water gaps: drainage crossings get a designed water gap or a sacrificial panel so a storm does not take out the run.
    • Wildlife accommodation: where the environmental permit requires it, a raised bottom wire or wildlife pass-through is built in; where exclusion is required, the bottom is closed and staked instead.

    Related base scopes: commercial chain link fencing, woven and fixed-knot wire fencing, and barbed wire topping.

    Grounding and bonding coordination

    A metallic perimeter fence inside or near a solar substation's ground-potential-rise zone has to be grounded and bonded per the project's electrical design, so fence grounding is a coordinated scope split, never an assumption.

    • Who does what: the electrical engineer specifies grounding conductor size, bonding points, ground rod locations and whether fabric, posts and gates are bonded individually or continuously. We install to that detail.
    • Sequence: ground rods and conductor runs frequently have to go in with or before the posts, which means the fence crew and the electrical crew share a sequence.
    • Gates: swing and slide gates need bonding jumpers across hinge and roller points so the leaf is not isolated.
    • Isolation segments: where the design calls for isolating fence sections, insulated splice details are installed exactly as drawn.
    • Scope split: whether fence grounding material and labor sits in the fence scope or the electrical contractor’s is confirmed in writing at bid, so nothing is assumed either direction.

    Gates, access roads and BESS enclosure fencing

    Gate openings on a utility-scale site are sized for the largest vehicle that will ever need through — component delivery, crane, and fire apparatus at the BESS block — not for routine O&M traffic.

    • Main entry: motorized cantilever slide or double swing, with a turnout long enough that a delivery truck clears the public road while it credentials. See commercial gates and operators.
    • Field and O&M gates: distributed around the perimeter so a technician is not driving miles of interior road to reach a string.
    • Access road interfaces: gates set back from the road edge, aprons and bollards where wheel paths threaten posts.
    • BESS enclosures: battery blocks get their own fenced enclosure with separation, gate widths and clearances driven by NFPA 855 and the fire district’s apparatus access requirement — confirm both before the gate schedule is set.
    • Substation fencing: typically framed chain link with topping and a defined grounding detail, coordinated with the interconnect requirements.
    • Construction phase: temporary fencing secures laydown yards and staging before the permanent perimeter closes.

    Wage and compliance requirements that flow down to subcontractors

    On solar projects claiming the Inflation Reduction Act bonus credit, prevailing-wage and apprenticeship requirements flow down to subcontractors, which means the fence crew's wage rates and payroll records are part of the owner's tax position.

    • IRA prevailing wage: laborers and mechanics of contractors and subcontractors performing construction, alteration or repair must be paid no less than applicable prevailing rates for the project to keep the bonus credit — the requirement does not stop at the EPC.
    • Apprenticeship: the apprenticeship labor-hour and ratio requirements are likewise measured across the contractor and subcontractor workforce.
    • Recordkeeping: owners and EPCs generally require certified payroll from every tier to substantiate compliance.
    • Davis-Bacon: applies where federal funding or a federal nexus brings it in, separately from the IRA credit requirements.
    • How we handle it: the wage, apprenticeship and reporting requirements that flow down to the fence subcontract are reviewed and confirmed in writing before bid, so the obligation is priced instead of discovered at award.

    Insurance, safety documentation and prequalification detail sit on our contractor credentials page.

    Schedule integration with the EPC's CPM schedule

    Perimeter fence is usually an early-and-late activity on a solar CPM schedule: a security perimeter is needed before modules arrive, and final closure often waits on substation and BESS equipment sets.

    • Two-pass sequencing: boundary fence early for site security, then interior and enclosure fencing after equipment sets, with gate openings held open for deliveries until a defined date.
    • Predecessors we need: cleared and staked fence line, resolved grading at the line, completed locates, and access adequate for a post driver.
    • Weather contingency: saturated ground stops post driving before it stops anything else on a solar site, so float is planned into wet-season runs rather than absorbed as a claim.
    • Reporting: daily production by station number so your scheduler can update percent complete without a site visit.
    • Punch and closeout: tension checks, gate operation, grounding verification with the electrical contractor, and the 1-year workmanship warranty.

    Credentials and proof for EPC prequalification

    S&S Fencing & Property Maintenance LLC is a family-owned and woman-owned Kentucky contractor operating since 2015, BBB A+ accredited and Blue Book ProView Verified, carrying general liability and Workers' Compensation with COIs on request.

    • Certificates of insurance naming the requesting party as additional insured, W-9, safety program documentation and project references are sent during prequalification — see the contractor credentials page.
    • Prequalification questionnaires and portal invitations are completed on request.
    • Completed work is documented in the projects gallery, including solar array enclosures and industrial perimeters along the I-65 corridor.

    Call 502-468-1209 to get the fence package priced from your drawings.

    How We Work

    Our Process

    1. Step 1

      Drawings, spec and quantity takeoff

      We take off perimeter length by station, count gates and assemblies, and confirm coating class, height and grounding scope split.

    2. Step 2

      Site walk and production planning

      Access, soil, grade breaks, drainage crossings and laydown are walked so the production rate in the schedule is real.

    3. Step 3

      Mobilize and build by the mile

      Driven posts, stretched fixed-knot or framed chain link, daily production reported by station number.

    4. Step 4

      Enclosures, closeout and warranty

      Substation and BESS enclosures after equipment sets, grounding verified with the electrical contractor, then punch and warranty turnover.

    Frequently Asked Questions

    Utility-scale solar perimeters are typically built from fixed-knot high-tensile wire on long boundary runs because it costs less per mile and follows terrain without panel breaks, and from framed galvanized chain link at substations, inverter pads and battery enclosures where a higher security posture and topping are required.
    A common specification is 12.5 gauge high-tensile wire at 179,000 to 200,000 psi tensile strength, giving roughly 1,380 to 1,535 lb breaking strength per wire in a fixed-knot configuration. Coating is normally Class 3 galvanized, or a zinc-aluminum coating such as Bezinal in aggressive environments.
    Class 1 galvanized wire carries substantially less zinc than Class 3 and begins corroding years earlier in the same environment, which is why Class 3 is the default on a solar asset with a 25 to 35 year life. Where humidity, agricultural runoff or industrial exposure is severe, a zinc-aluminum coating extends service life beyond Class 3.
    The project's electrical engineer specifies fence grounding — conductor size, bonding points, ground rod locations and gate bonding jumpers — and the installation is performed to that detail. Whether the grounding material and labor sits in the fence contractor's scope or the electrical contractor's is a scope split that must be settled before mobilization.
    Yes. On projects claiming the Inflation Reduction Act bonus credit, the prevailing-wage and apprenticeship requirements apply to laborers and mechanics of contractors and subcontractors performing the construction work, not just to the EPC. Owners and EPCs generally require certified payroll from each tier to substantiate compliance.
    Perimeter fence is normally a two-pass activity: the boundary line goes in early to secure the site before module and equipment deliveries, and interior substation and battery enclosure fencing closes after equipment sets. Wet-season float is planned in because saturated ground stops post driving before it affects other activities.

    Send us the drawings and the spec section

    We bid from plans, walk the site, and return a line-item scope. Ask Shawn or Shelby Fick directly at 502-468-1209.

    Also See

    Related Scopes & Documentation

    Family-Owned · Woman-OwnedFully Insured · COIs on Request1-Year Workmanship WarrantyNew Installs & Full ReplacementsFree On-Site Estimates
    BBB Accredited BusinessBlue Book ProView Verified

    Ready for your free fence estimate? Call Shawn & Shelby anytime.